台北市大安區經歷不拘大學待遇面議
•The BIM Coordinator liaise with both internal and external stakeholders and will serve as the primary BIM interface contact for A/E contractors across all phases and disciplines of project deliveries. This role will be the key subject matter expert for design BIM and will be vital in educating, training and supporting the in-house engineering design team as we implement the BIM execution plan. He or she in this role will include, but not be limited to assisting in 3D Model Development, Interference Checking & Design Coordination, 4D Integrated Scheduling, 5D Integrated Costing, 7D Asset and Operational Integration, COBie (Construction Operations Building information exchange) data population and extraction, Q/A & Q/C, and assisting in the development of the BIM processes, standards and procedures.
• Ensures the Project BIM Strategy and BEP is aligned and executed in alignment with the Project Execution Plan (PEP).
• Assigns the key roles on the Project identified in the BEP.
• Ensures the implementation of the Building Information Model for use across each stage of the Project.
• Maintains continuous contact with key functional leads across the programme, including Engineering, Project Controls, Contracts, Construction, and Client stakeholders, to monitor the implementation of BIM.
• Works closely with the project functional teams to understand the information requirements (both graphical and non-graphical) and align the BEP to meet those needs.
• Works closely with the customer IT department on the deployment of automation tools, identifying user groups, and ensuring the integration of the various software tools through the Common Data Environment (CDE).
• Develops and implements the Project BIM Strategy and BEP through the design, procurement and construction phases, and handover to end users.
• Champions the use of the CDE as the single source of truth for all project data and the key tools for project execution including 3D/4D/5D deployment.
• Works with all departments to establish standards for BIM execution, including any required procedure and contract changes, and a standard BIM library for use by design and construction contractors for developing BIM models
• Provides input into the design requirements including the level of detail and data attributes required to support the required outputs through the phases of the Project.
• Ensures the implementation of the CDE, including relevant standards on its use and application across projects.
• Develops the BIM automation plan.
• Ensures adequate training is provided on the use of the Building Information Model and associated tools to assist its deployment, including engagement with off-Project subject matter experts.
• Conducts regular Assessments to review the implementation of the BEP and level of BIM maturity achieved on projects, and to seek opportunities for improvement.
• Ensures projects meet the client information requirements and industry wide standards (i.e. ISO19650).
• Champions innovation across the programme by establishing a culture for ideas and improvement opportunities to be raised, considered and implemented. Continually seeks ways in which the Building Information Model can be utilized to support the Project and drive efficiency in processes.