台南市善化區5年以上專科待遇面議
Mission
The Site Manager is responsible for coordinating the construction of one or more sites. He/She sets up and monitors the overall organization of the sites in conjunction with the Site supervisors. He/She must comply with all the safety, quality and technical regulations and standards in force. He/She is also responsible for ensuring that the works progress smoothly in compliance with costs, deadlines and resources. He/She reports to the Head of Regional Site Teams (regularly) and reports functionally to the Project Manager of the GCP Ops department. He/She is responsible for site record management and provides feedback at site closure.
Responsibilities:
1. Schedule drafting and monitoring supervision
2. Budget management
3. Project preparation
4. Project / site management
Comply with the site organizational requirements as defined with the Project Manager and the GCP /Ops Operation department.
Manage the project in conjunction with the Site supervisor(s) (in accordance with the job specifications, the contractual terms, the Assignment order, the Quality plan, the HSE plan and the operating procedures).
Accept and store the equipment and devices on site.
Ensure that the site organization and the work execution procedures, tests and commissioning and all the resources used on the site(s) (buildings, containers, machines, vehicles) comply with the current legislation and the local regulations. With respect to HSE issues, He/She relies on the HSE manager on each site.
Provide the Site Works Coordinator with technical support, if required.
5. Compliance with Quality of service/supply
Take all the measures required to control the products supplied by the customer and incorporated in the works and operate or ensure the operation and quality of the site(s) in accordance with the project operating procedures, folders and instructions received in order to comply with the Quality Management System. (NCR monitoring, etc.)
Understand and qualify the customer's facilities in order to propose improvement works or solutions.
Ensure that the monitoring, test and commissioning equipment and devices are maintained, routinely checked, calibrated, transported and delivered to the site.
6. Interface with the Project Manager and reporting
In conjunction with the Site Works Coordinator, draw up the following documents and send them to the Project Manager and the GCP /Ops Operation department: monthly status report with discrepancy monitoring, monthly progress report, minutes of meetings, statement of damage occurring during transportation and on site, state of the equipment on arrival on site, condition of the final stocks, operating incident records, equipment incident records, non-conformance records, etc.
7. At the end of the project, in conjunction with the Site Works Coordinator, prepare all the items required for the end-of-project assessment and feedback with the organization responsible for the contract and ensure that the annotated documents and drawings (assembly, tests, etc.) are centralized at the end of the project in order to check that they are valid before sending them to the Project Manager and to the customer, after approval by the Project Manager.
8. Compliance with HSE requirements
9. Authority
According to the skills, means and authority, the site manager has overall responsibility for the EHS aspects on sites for which he/she is responsible.
10. Schneider Electric charter of values and instructions
Comply with the Schneider Electric charter of values and make sure that it is complied with on site by the personnel.
Comply with Schneider Electric instructions and ensure that they are complied with by the personnel.